Air Quality Consultants Ltd., working on behalf of Aardvark EM Ltd, assisted in achieving planning approval in 2015 for a new Materials Recovery Facility (MRF) and Energy Recovery Facility (ERF) in Bridgwater, Sedgemoor.
The facility will process some 80,000 tonnes of non-hazardous material per year that would otherwise have been landfilled.
The air quality assessment used detailed dispersion modelling, using the ADMS-5 model, to assess the air quality impacts of pollutant emissions from the facility’s chimney stack on existing residential receptors and sensitive ecosystems in the local area.