Simon is our Group I.T Technician and joined the company in 2023.
Simon is originally from Zimbabwe where he studied Information Technology and then continued his studies in South Africa where he gained his I.T Experience. He is responsible for I.T Support within the Group.
Always get prompt information and assistance from Steve Moorcroft. Don't have any suggestions for improvements.
London City Airport
A 1,600 hectare solar farm including battery storage and grid infrastructure.
Air Quality Consultants was able to demonstrate that the existing configuration of the plant was acceptable, with no new chimney stack required, saving the client more than £100,000 in up-front costs, as well as avoiding potential local opposition.
Delivering time and cost savings whilst securing continued regulatory compliance.
Air Quality Consultants Ltd formed part of the project team which assessed the effectiveness of different approaches to reducing air quality impacts on designated nature conservation sites.
© Air Quality Consultants 2026