Our case studies provide a more detailed account of some of the different projects that we have worked on.
Development of documentation to support the discharge of improvement conditions in the environmental permit for a new data centre.
Leading the substantial permit variation to increase the capacity of plasterboard manufacturing at Etex’s existing site in Bristol.
Permitting support for a variation to enable the development of Northern Ireland’s first biomethane gas-to-grid connection.
Permitting support for a variation to introduce screening of incinerator bottom ash (IBA) at an existing Energy from Waste facility.
Delivering time and cost savings whilst securing continued regulatory compliance.
Supporting the sustainable management of North London’s waste arisings.
Air Quality Consultants was able to demonstrate that the existing configuration of the plant was acceptable, with no new chimney stack required, saving the client more than £100,000 in up-front costs, as well as avoiding potential local opposition.
Always get prompt information and assistance from Steve Moorcroft. Don't have any suggestions for improvements.
London City Airport
© Air Quality Consultants 2026