Our case studies provide a more detailed account of some of the different projects that we have worked on.
Delivering time and cost savings whilst securing continued regulatory compliance.
Supporting the sustainable management of North London’s waste arisings.
Air Quality Consultants was able to demonstrate that the existing configuration of the plant was acceptable, with no new chimney stack required, saving the client more than £100,000 in up-front costs, as well as avoiding potential local opposition.
Very swift at dealing with enquiries and putting forward solutions to problems.
Peacock & Smith Ltd
© Air Quality Consultants 2025